Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Mar 29, 2020     9-11 step 3-6 ELEVATOR Rivet E-1008 B Halves to spar on both sides - (2 hours)       Category: Tail Feathers
Riveted with squeezer the rear spar to the E-1008B halve on the right elevator (bottom skin) together with Lucio. Riveted the shear clips in the right position

Riveted with the squeezer the rear spart to E-1008B halves on the left elevator (TOP Skin).
One rivet on shear clip not good. Drilled out with some difficulties. slightly enlarged hole. Riveted with bucking bar with better result.
RIveted shear clips and gussets to spar


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.